Electrical service requests

PLEASE SELECT A WORK TYPE
1. New Service
Select this option when there is no existing electrical service at the premise and you would like to bring in service either temporarily or permanently.

2. Service Upgrade
Select this option if you are changing the size of your electrical service or switching between overhead and underground service. This includes moving the location of service at the same time.

3. Add Equipment
Select this option when adding equipment to an existing electrical service. This includes the installation of solar panels and/or battery storage in either a Net-Metering arrangement or non-exporting generation configuration. It also includes adding additional meters to your property (e.g., for a basement suite or secondary unit).

4. Premise Maintenance
Select this option for work related to maintaining or modifying your existing electrical service. This may include changing the location where the service enters the building, changing the panel, requesting to isolate the service to complete electrical maintenance (like installing a transfer switch), or to isolate the service for non-electrical maintenance (like structural repairs on a building).

5. Removal
Select this option when you no longer need either a permanent, temporary or unmetered service(s) or are demolishing the building.

6. Clearance Inspection
Select this option when you require a clearance inspection for a pool installation or building construction.

7. Infrastructure replacement/relocation?
For City parties, MTO, or consultants undertaking road or utility work.
PLEASE SELECT A WORK SUB TYPE
New Construction

New Unmetered Service

Temporary Service
Upgrade Service Size

Overhead to Underground service

Underground to Overhead service

Upgrade/modify unmetered service
Add Meters
Select this option when adding meters to an existing service. 

Distributed Energy Resource (DER Installation)
Select this option if installing solar panels and/or battery storage at your home or business in either a net-metering arrangement or a non-exporting generation configuration.

Panel Change

Relocate Electrical Service
Moving your panel location, relocating overhead/underground Hydro service

Isolation for electrical maintenance
Meter pull, GenerLink™, transfer switch or electrical maintenance

Isolation for non-electrical maintenance
Tree trimming, painting, siding work, etc.
Removal of a residential service

Removal of commercial service
Removing a temporary service, removing a meter from commercial building

Removal of unmetered service
Pool Clearances
Clearances from power lines for pool installation

Building Clearances
Clearances from power lines and buildings
Road Re-surfacing
Work completed by the City of Ottawa, the MTO, or their consultants

Road Re-alignment or Widening
Work completed by the City of Ottawa, the MTO, or their consultants

Replacing Utility Infrastructure
Work completed by the City of Ottawa or utilities

Construction Activities Requiring Hydro Equipment Relocation
Work completed by the City of Ottawa, the MTO or their consultants


Site Information





Requester

Contractor Information






Customer Information








Account Number
Your 20-digit account number can be found on your Hydro Ottawa bill (top left corner)
GridFlex New Home Battery Storage Incentive


If Applicable

Electrical Information




Information is located on your main panel












Enter the combined Direct Current (DC) nameplate capacity of all solar panels in the array. Calculate this as: (Total number of panels × Manufacturer panel wattage) ÷ 1000. Please indicate "0" if not applicable.

Enter the total maximum continuous Alternating Current (AC) output rating of the solar inverter. This represents the maximum AC power capacity that can be delivered to the electrical panel and/or grid. Please indicate "0" if not applicable.


Select all applicable certification standards for your inverter model. This information can be found in the 'Certifications' or 'Compliance' section of the manufacturer's spec sheet, on the NRTL test certificate (CSA, UL, ETL), or printed on the safety label on the side of the inverter chassis


Enter the nameplate energy storage capacity in kilowatt-hours (kWh) as specified on the manufacturer's spec sheet before depth-of-discharge limits

Enter the usable energy storage capacity in kilowatt-hours (kWh) available for operation, accounting for the manufacturer's depth of discharge limits

Enter the maximum continuous power output rating in kilowatts (kW) that the battery system (or storage inverter) can supply to the electrical panel and/or grid

Estimated Project Costs
*Estimated project costs will be used to calculate the value of the estimated project incentive.
Material Cost ($) Labour Cost ($) Other Costs ($) Total ($)
Estimated Project Costs
Input "$0" if not applicable
Input "$0" if not applicable
Input "$0" if not applicable
Input $0 if not applicable


Select Yes if an existing DER exists at the location (either solar or home battery storage). For example, adding panels to make an existing array larger

* Net-metering requires renewable generation, and customers receiving incentives through the Save On Energy Home Renovation Savings Program are not eligible to enroll in net-metering. Visit this page for more information regarding these choices.

Include any additional project information here.

Files
10 MB limit.
Please attach the following If applicable:
  1. Site Plans
  2. Building Plans
  3. Load Summary (Appendix A)
  4. App D (Appendix D)
  5. Single Line Diagram
  6. Pictures
Please upload any additional applicable pictures, forms, or paperwork.
Files
10 MB limit.
Please attach the following (Mandatory / If applicable):
  1. Site Plans
  2. Building Plans
  3. Load Summary (Appendix A)
  4. App D (Appendix D)
  5. Single Line Diagram
  6. Pictures
Please attach each of the following documents (all are Mandatory):
  1. A close-up photo of the meter and meter base, clearly showing the meter ID number and wiring conduit entering and exiting the meter.
  2. A photo showing the entire side of the structure where the meter is located.
  3. A photo of the main breaker on the electrical panel showing service size.
  4. A single-line diagram of the proposed system.
  5. A completed Micro-Distributed Energy Resources (DER) Connection Agreement.
  6. A copy of the project estimate/quotation (required if applying for "GridFlex New  Home Battery Storage Incentive").
*Prior to pre-approval, the participating customer will need to certify that they meet all of the eligibility criteria as outlined in the GridFlex Program Participant Terms and Conditions.